07976 546 297
01324 412 154
 
 

Keabog Mill Steadings

This project included the excavation and installation of two underground water storage tanks located at each end of the potable water supply pipe run. The pipe run included 800 meters of gravity fed potable water supply pipe to the lower storage tank which fed a booster pump set. The booster pumping set delivered the required water on demand through individual water meters and stop cocks to 4 x renovated and converted properties. The tanks and potable pipe work were chlorinated in accordance with water board regulations before use.

100_1202100_1200100_1199100_1195100_1201100_1197100_1193100_1203100_1208100_1210100_1211100_1212100_1214100_1215

« back to potable water and civil mains projects

Customer focus

leafAt Applied Irrigation we are passionate that strong client relationships and good customer service are as important as the quality and technical proficiency of our work.

Have a question?

Ask us and we'll get back to you right away. Our privacy policy.